Suez Canal Nearly Complete / Woodblock / April 3, 1869

This woodblock engraving from April 3, 1869, shows the Suez Canal nearing completion. I am interested in the history of the canal and the people who built it. I have a few tokens used by workers at the company store.

The Illustrated London News, April 3, 1869

Laborers are shown removing rock in a section of the canal. The canal, 164 kilometers long and 8 meters deep, was an enormous engineering challenge. The waterway passed through mostly sand and low lying lakes and rivers connecting the Mediterranean Sea to the Red Sea,

The canal took 10 years to build. Ferdinand de Lesseps formed the Suez Canal Company to finance and build the canal. The company completed it in November 1869, seven months after this newspaper was printed.

A construction company called Ch. & A. Bazin issued this French Franc token in 1865. It can be found in denominations of 5 Francs, 1 Franc, 50 Centimes, and 20 Centimes.

Leave a Comment

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s